JamesLuk

8/11/2014
Unknown

Position Desired

Project Engineering
sunnyvale, CA; bayside, NY
Yes

Resume

Education
Cornell University, Ithaca, New York
Bachelor of Science Degree in Electrical and Computer Engineering May 2007

Professional Experience
Lockheed Martin Aeronautics ¨C Advanced Development Programs October 2009 ¨C Present
Systems Architect Palmdale, CA
¡ñ Built DODAF 2.0 Capability Viewpoints, Operational Viewpoints, and System Viewpoints using Rhapsody.
¡ñ Updated existing architecture views using System Architecture.
Systems Engineer
¡ñ System Engineer, Integration of Advance Technologies onto Specialized Aircraft
¡ð Acted as key integrator to unify all participating departments (System Engineering, Configuration Management, Software, Communications, System Integration and Test, Program Management, Operations and Maintenance, Combined Task Force, Air Vehicle, System Safety, Cargo Bay, Finance, Contracts, Procurement, Schedule, Logistics, sub-contractors) to the new the project.
¡ð Developed and maintained a Requirement Verification and Traceability Matrix for several programs.
¡ð Validated, verified, and assured quality of products from sub-contractors and delivered to customers.
¡ð Directed the development and execution of a Preliminary Design Review and a Critical Design Review.
¡ð Organized and collaborated with multiple disciplines to develop Interface Control Documents.
¡ð Developed 100+ requirement closure plans to verify requirements and obtain customer concurrence.
¡ð Coordinated the release of dozens of approved documents through Configuration Management as Contract Data Requirements Lists.
¡ð Created Basis Of Estimates and a Bill Of Material using information from all disciplines.
¡ñ System Engineer, Integration of a New Development
¡ð Led an engineering team of three through design and implementation to support customer needs.
¡ð Developed, maintained, and executed an eighteen month schedule.
¡ð Decomposed customer requirements into an executable requirement set using DOORS.
¡ð Enhanced efficiency by being the technical liaison between customers, contractors, and sub-contractors.
¡ð Performed physical site inspections to confirm proper delivery of site according to system requirements.
¡ñ Control Account Manager/System Engineer Lead, Production of Kits
¡ð Held the responsibility for the team to stay on the proposed budget.
¡ð Enforced processes and propagated status between multiple Integrated Product Teams, buyers, and management to ensure punctual delivery of product installation.

Lockheed Martin Systems Integration December 2007 ¨C October 2009
Systems Integration/Test Engineer Owego, NY
¡ñ Integrated Digital Moving Map, ...

Login or Register to view the full resume.