Over 35 Year experience with Foster Wheeler Corporation in Power Plants and Petrochemical facilities.
• Experience on a variety of large projects including Power Plants and petrochemical facilities. Experience in both Structural Steel and Reinforced Concrete.
• Technical Strengths: Structural arrangement, analysis and design, development of design standards and connections, structural retrofit solutions. Independent design and staff management of design and drafting. Complete familiarity and understanding of relevant codes, ASCE, IBC, AISC, ACI, OSHA
• Project Related: Interdiscipline coordination, client interface, proposal, estimate, procurement and scheduling support, contract document review and technical bid evaluation.
• Excellent written and communication skills.
• International Assignments in Poland,Venezuela and Peoples Republic of China.Experience
5/2001 – Present Foster Wheeler North America Corp, Clinton NJ 08820
Supervising Engineer (Principal Engineer)
Responsible for structural steel design and engineering for the support of Steam Generators and SCR Structures (Selective Catalytic Reduction) and associated ducting and auxiliary equipment. Responsibilities also included Project Support from proposal to execution stage.
Representative Projects:
- Longview Power Project, 695 MW, Steam Generating Unit, Maidsville West Virginia
- Virginia City Hybrid Energy Centre, 600 MW, two CFB Units.
- Rio Turbio (Argentina) 240 MW CFB steam generating unit.
- Carolina Power & Light Company: Roxboro Generating Station Unit 3, SCR retrofit
- Indianapolis Power & Light Company. Petersburg Generating Station Unit Nos 2 and 3, SCR retrofit
-
10/1999 – 4/2001 Foster Wheeler USA, Clinton, NJ 08820
Senior Specialty Engineer
Analysis and Design of Major Long Span Pipe rack steel and foundations from Boiler building to Turbine building and auxiliary support structures for ancillary buildings for JEA Power Plant Project, Florida
10/1997 – 9/1999 Civil Engineering Supervisor
Assigned to supervise Major Polish Engineering Design Firm contracted by Foster Wheeler for Major Power Project (Turow Power Plant, 6 units) in Poland
1/1993 – 9/1997 Senior Specialty Engineer
Responsible for civil/structural design of process plants for the petrochemical industry including oil refineries, fertilizer plants, chemical plants, power plants, and resource recovery facilities.
Representative Projects:
- 3,850 MTPY grass-roots purified polysilicon manufacturing ...